Product tour

Easy like Monday morning.

It's hands off because it runs itself. Hands on works, too.

See it in 30 seconds

Getting started

Set up in one sitting.

Student inputs — not just their stats but what gets them excited. Your home — it's already loaded with educational resources. We factor all of it in.

Pick your courses or let us recommend them for your state and grade level. Set the days for classes to meet and define your quarters.

Resource builder
Theme page archetype selector
Your school’s DNA

Unschool? College Prep? Something in between?

Before touching any curriculum, we ask you to build your school’s theme: educational philosophy, tone, what to lean into, what to avoid, assessment philosophy, values and worldview. Start with our presets or write your own.

Archetypes include Classical, Charlotte Mason, Eclectic, STEM, Montessori, Waldorf, College Prep, and Unschooling.

The lessons

Written for one kid. Yours.

Every lesson is original content built overnight from your child’s profile, their recent work, and your educational philosophy. Their interests show up in the examples.

For accommodations, the system is vastly customizable to the student. You have three main levers for dialing in your learning needs and difficulty at the student level. First, the "Challenge" setting: Gentle, Standard, or Aspirational for how easy or difficult you want everything to be in general. Second, the student notes that let you list anything at all that the system should know like disabilities or history. Last, the grading rubric where you can dial in exactly how strict the grading and feedback should be for your different assessment types.

Student lesson
Seamless Assessment

Every lesson gets a grade.

You have control over what kind of assessments to offer, and the curriculum picks one for every lesson. If it's writing, grades 3-5 can submit handwriting by photo (and be graded on penmanship in addition to grammar or spelling).

Photo writing submission
AI tutor on every lesson

Total context.

Every lesson page has an AI tutor that knows the lesson and what is on the page, with adjustments for grade level and guardrails for safety.

AI tutor chat on lesson page

What we’re not

We don’t have math.
Or high school science.

Our family uses Khan Academy for all grades of math instruction and high school science courses, and we think everyone should use it. It’s excellent and free, and it works wonderfully for these subjects. For everything else we built this system that generates highly personalized content for only the subjects we need.

We can let it pick the recommended courses for our grade and state, or we can choose to add/replace with content from any level we want whether it’s catching up last year or jumping two grades ahead.

Try it with your family

Our system assumes the student can already read and write. That’s why we start at third grade. Settings for auditory or visual learners enhance every lesson with text-to-speech playback and extra images, plus adjustable text settings for extra accessibility.

Gradebook or graded writing
Grading

Honest feedback. Not just a checkmark.

Writing is graded against your custom rubric and returned with actionable feedback. Rubrics are editable per student with leniency controls, plain English instructions, and grade floors.

A structured evaluation tells you where your child is strong and where they need work, which it uses the next day.

Morning teacher guide

Your playbook, every morning.

Today’s lessons broken down: the core concepts, concrete teaching strategies tailored to your child, what the assessment expects, and a conversation starter you can use at dinner.

Second screen is the secret sauce. We give you the expert pedagogy to get the most out of the content for every lesson, every day.

Morning teacher guide email
Nightly analysis page
Nightly analysis

It remembers everything.

Every night, the system reviews what your child wrote, how they scored, and what patterns are emerging. Strengths, gaps, engagement trends. That analysis feeds directly into tomorrow’s lesson.

The rolling memory of your child’s work shapes every lesson that follows — reinforcing where they’re weak, advancing where they’re strong, staying genuinely personal.

Flexible pacing

For real life.

We give you four quarters to work with. What you do with them is up to you. Set whatever dates you want, punch in some holidays. The curriculum flows around it like water and fills in whatever space you give it.

At the end of each quarter, decide whether to overflow missed lessons into the next quarter or move on. Join mid-year? No problem — the system picks up wherever you are and fills in the remaining weeks, starting from whatever you already worked on.

Weekly schedule
Progress report
Compliance & reporting

Everbody wins.

The first thing we make is a year outline that can be automatically crafted into submission to your district to fulfill your preliminary report requirement. The rest of the reports are a click away when the quarters end. And they're a work of art.

Generate a report each quarter or a cumulative one at year-end. What comes out will far exceed what any school district expects. No more end-of-year scramble to reconstruct what you did.

Ready to try it?

Start your free trial — 14 days full access. Card required at signup, cancel anytime.

Sign Up Now

Want to see the actual curriculum?

Explore a real quarter of AI-generated lesson plans — 50 sessions across English III and World History, with full lessons you can read right now.

See Sample Curriculum